Chemical liquids Drum Filling Machine

e777乐彩线路检测Chemical liquids Drum Filling MachineBasic parametersMaximum weighing capacity: 400kgMinimum sensitivity: 0.1kgFilling error: less than ± 0.1%Filling speed: approximately 40-60 barrels per hour (depen

  • Brand: glzon
  • Model: GZM_200L

Chemical Liquids Drum Filling Machine

ATEX Certified ∙ ±0.15% Accuracy ∙ Zero Spills
For Acids, Solvents, Monomers & Hazardous Formulations

Shanghai Guangzhi Automation’s GZ-ChemFill Series sets the industrial standard for safe, precise transfer of aggressive chemicals into 200L drums. Combining explosion-proof architecture (ATEX/IECEx Zone 1), corrosion-resistant materials (Hastelloy®/PTFE), and AI-driven flow control, this system eliminates vapor emissions, reduces waste by 99.7%, and ensures OSHA/REACH compliance for high-risk liquids like HCl, TDI, and acetone.

Chemical drum filling machine


Critical Safety & Performance Features

✅ ATEX Zone 1/21 Certification
Pressurized Ex pxb IIC T4 control cabinet + intrinsically safe sensors.
✅ Corrosion-Proof Fluid Path
Hastelloy C-276 pump | PTFE-lined hoses | Kalrez® 6375 seals (resists pH 0–14).
✅ VaporGuard™ Closed System
Dual diaphragm seals + nitrogen blanket cap for zero VOC release.
✅ StaticSafe™ Technology
Conductive grounding (<10 Ω) with real-time resistance monitoring.
✅ Smart Viscosity Compensation
e777乐彩线路检测Handles 1–500,000 cP liquids (e.g., methanol to molten sulfur).


Technical Specifications

Table: GZ-ChemFill Technical & Compliance Metrics

ParameterSpecificationCertification/Validation
Filling Volume5–200 LAdjustable in 10 mL increments
Accuracy±0.15% (gravimetric)NIST-traceable (ISO/IEC 17025)
Throughput40 drums/hour (200L)
Viscosity Range1–500,000 cPHeated path (150°C max) optional
Material ContactHastelloy C-276 / PFA / ZrO₂ ceramicsASTM G48 Corrosion Test: <0.1 mpy
Explosion Proof RatingATEX: Ex db eb ia mb IIC T4 GbIECEx, NEC 505 Class I Div 1
Power Supply480V/60Hz, 5.5 kWIP66 motors + isolated transformer
Control System12" HMI with ERP integration21 CFR Part 11 (audit trail)
Safety SystemsSeismic shutdown, O₂ monitor, spill basinSIL 3 (IEC 61508)
ComplianceREACH, OSHA 1910.119, EPA 40 CFR Part 68PED 2014/68/EU

Industry-Specific Engineering

⚗️ Strong Acids & Bases

  • HCl/H₂SO₄/HF Handling: Zirconium fluid path (HF-resistant)

  • Caustic Soda Filling: Steam-traced lines to prevent crystallization

百万文字论坛 - 综合转载各坛资料-百万文字论坛500608com-03024百万文字论坛资料-500608百万综合文字论坛-798790百万文字论坛开奖-500608百万文字论文网站 澳门理财婆169292小天4肖8码-理财婆169292一码-169292理财婆一肖一码-理财婆一肖一码必中-理财婆论坛精选四肖-理财婆57049 小龙女论坛4肖8码-小龙女高手论坛-小龙女心水论坛-小龙女最准一肖一码-小龙女论坛4肖8码-澳门小龙女新澳门码料